How laser cutting prices are calculated

AllTerra Calculator has two live pricing models: Business plan and Hourly rate (norm-hour). Both start from the same machine time, built from the nested parts. Below are the formulas in plain language, as used at calc.1cterra.ru.

Machine time (both models)

Machine time is not just cut length. The calculator builds the hours roughly like this:

Pierces come from the outer contours and holes in the DXF. Cut length comes from the nest. Speeds and pierce times come from the cutting mode for the material and thickness. Without those shop values, the calculator cannot give a realistic time.

Business plan (full cost model)

In Business plan the calculator adds up itemised cost lines, then applies margin. Your machine hourly rate is not used as a simple multiplier here. Labour and equipment already have their own cost lines.

Cost lines you can switch on in settings:

Hourly rate / norm-hour model

In Hourly rate mode the quote is simple: material plus Hourly rate × billable time. Billable time is machine time plus sheet handling (loading and similar) and bridge-break work, as set up. It is the time the machine is tied up and cannot cut another job.

Gas, energy, depreciation and rent are set to zero in this mode, so they are not paid twice on top of an all-in hourly rate. Sheet repositioning can still show as its own line, and is still counted as machine time.

Outside the hourly rate: CAM and nesting office work, delivery and packaging. They are not folded into the machine hour. Delivery and packaging can appear as separate sums when used.

VAT

If VAT is on in company settings, VAT = price without VAT × VAT percent ÷ 100, added on top. The default is 20% when you turn VAT on. If VAT is off, no tax amount is added.

What is and is not included

Included when set up: material, the machine-time factors (length, speed, corners, pierces, idle) and the cost lines for your pricing model. The calculator applies your numbers. It does not fill a missing price list with invented average prices.

The live calculator interface is in Russian, English and German. This marketing site has more languages. Do not assume every screen text of the calculator exists in every language of this site.

Side-by-side

TopicBusiness planHourly rate
Main driversItemised cost lines + marginMaterial + rate × billable hours
Machine hourly rateNot used as the main multiplierCentral to cutting labour
Gas / energy / rent linesCalculated when switched onZero (covered by the rate)
Best whenYou need a full cost breakdownYou quote from a shop hourly rate

If you are moving from a spreadsheet, map your cells to these terms once. Sheet price → material catalogue. Minutes under the beam → machine time. All-in shop rate → Hourly rate. Itemised overheads → Business plan. The calculator does not guess missing cells. An empty rate gives an empty or zero line, not an invented average.

Once you understand the formulas, set up cutting modes for each thickness you quote often. Pierce time and cut speed matter most on small parts. Idle travel matters on nests with many separate contours. Revisit VAT and margin only after the cost core matches a job you already understand on paper.

To present the same numbers to a customer, go to the quoting software page. To see how geometry becomes cut length, read DXF nesting and the nesting engine pages. This page claims no universal euro-per-metre price. Money on calc.1cterra.ru is in RUB.

Corner slowdown is worth a second look on thick plate with many sharp corners. The extra seconds are small per corner, but they add up on ornamental parts. Idle travel is worth a look on nests with dozens of separate pieces spread over a large sheet. Both are part of machine time today.